CommercialFull Façade PackageComplete

ROYAL MARSDEN HOSPITAL

Sutton, London
Home/Projects/Royal Marsden Hospital
Project Overview

ROYAL MARSDEN
ASEPTIC SUITE

Kelson Facades was appointed by Russell Cawberry to deliver the full throughwall façade package for a new extension at the Royal Marsden Hospital in Sutton — one of the world's leading cancer research and treatment centres.

The extension was designed by Ansell & Bailey to house a new plant room serving the hospital's aseptic suite, supporting critical cancer research and development. Kelson Facades was responsible for the complete design, supply and installation of a fully built-up Rockpanel rainscreen cladding system.

The scope included sheathing board, Tyvek membrane, vertical helping hand and rail system, Rockwool insulation, Rockpanel panels and all aluminium rainwater goods and flashings — delivering a technically precise and weather-tight façade to a demanding healthcare brief.

Contractor

Russell Cawberry

Architect

Ansell & Bailey

Sector

Commercial / Healthcare

Package

Design, Supply & Install — Full Façade

Cladding System

Rockpanel Rainscreen

Location

Sutton, London

Status

Complete

Project Sequence

PROJECT TIMELINE

01

Site Surveys

Detailed site surveys at the Royal Marsden to understand the existing structure and establish requirements for the new extension's façade package.

02

Material Procurement & Manufacture

Rockpanel cladding panels, Rockwool insulation, Tyvek membrane, aluminium rainwater goods and all fixings procured and scheduled for phased delivery.

03

Sheathing Board Installation

Sheathing board installed to the external face of the new structural frame, forming the first layer of the fully built-up rainscreen system.

04

Tyvek Membrane

Tyvek breather membrane applied over sheathing board to provide a windtight and vapour-permeable barrier across all elevations.

05

Vertical Top Hat Sections & Helping Hands

Vertical top hat sections and helping hand brackets installed to form the support framework for the rail and panel system.

06

Insulation

Rockwool insulation installed between the support frame, providing fire performance and thermal efficiency to the completed façade.

07

Vertical L & T Rails

Vertical L and T rail system installed to complete the primary support structure for the Rockpanel cladding panels.

08

Rockpanel Installation

Rockpanel cladding panels installed to all elevations, each panel fixed, aligned and checked to ensure a consistent and high-quality finish throughout.

09

Aluminium Cappings, Flashings & Rainwater Goods

All aluminium cappings, flashings and rainwater goods installed to complete the weathertight envelope and deliver a fully finished façade system for handover.

Supply Chain Partners
Rockpanel Rockwool SBS Cladding Mainline Fixings Tri-Fab Tyvek
Project Photography

PROJECT GALLERY

Royal Marsden Hospital 1
Royal Marsden Hospital 2
Royal Marsden Hospital 3
Royal Marsden Hospital 4
Royal Marsden Hospital 5
Royal Marsden Hospital 6
Royal Marsden Hospital 7
Royal Marsden Hospital 8
Royal Marsden Hospital 10
Royal Marsden Hospital 11
Royal Marsden Hospital 12
Royal Marsden Hospital 13
Royal Marsden Hospital 14
Royal Marsden Hospital 15
Royal Marsden Hospital 16
Royal Marsden Hospital 17
Royal Marsden Hospital 18
Royal Marsden Hospital 19
Royal Marsden Hospital 20
Royal Marsden Hospital 21
Royal Marsden Hospital 22
Work With Us

HAVE A SIMILAR PROJECT?